[ic] What would be required to move from 4.8.7 to 4.9.?

Andrew Rich interchange-users@icdevgroup.org
Mon May 5 19:33:01 2003


Hi All
I have a nice stable 4.8.7 on RH 7.3 + Perl 5.6.1
Originally a 4.8.5 install which has been updated to 4.8.6 then 4.8.7.
It is a while ago but I believe I installed the 4.8.5 using RPMs as have the
updates.
A few questions:
Would I be able to install 4.9.? without affecting my 4.8.7?
Can they both run at same time? ie have sites on each.
What is going to break moving the 4.8.7 site across?
it is 99% foundation demo at the moment.
Regards
_______________________________________
Andrew Rich
Maps Downunder
Ph: +61 3 9748 0422 Fax: +61 3 9748 0422
<<mailto:andrew@mapsdownunder.com.au>>
<<http://www.mapsdownunder.com.au/>>